Traditional loaders’ low per-trip capacity creates inefficiency: 6 trips/hour for gravel transport, doubled time for container handling. The High Payload Loader solves "time + cost" waste by boosting per-machine efficiency.
1. Data Comparison: Stark Efficiency Gaps
lTraditional Loader: 10 tons/trip → 10 tons/hour → Fuel: 2.5L/ton
lHengwang HW-940 High Payload Loader: 15 tons/trip → 15 tons/hour → Fuel: 1.8L/ton
lResult: 50% higher efficiency, 28% lower fuel consumption, saving >$15,000/year per machine.
2. Real Scenarios: How High Payload Loaders Reshape Operations
Construction Site Gravel Transport:
Traditional equipment: 6 trips for 100 tons.
High Payload Loader HW-940 (2-ton): Only 4 trips, saving 2 hours/day, shortening project timelines by 15%.
Port Container Handling:
High Payload Loader HW-50 (5-ton): Lifts 2 standard containers per trip, reducing 3 round trips vs. traditional equipment. Port throughput increases 40%.
3. Hengwang High Payload Loader’s "Hardcore Advantages"
lExtreme Capacity: HW-940/50/30 series High Payload Loaders cover 2-5 tons, adaptable to gravel, building materials, and containers;
lCompliance Design: CE-certified + low-fuel tech, avoiding fines and energy waste;
lSmart Efficiency: Hydraulic torque converter + reinforced frame cut failure rates by 60% and maintenance costs by 40%.